If I select multiple tasks tagged with the same project, I want a way to auto-assign them into the next available time blocks tagged for that project.
For example: 4 tasks for “AI Workshop” are automatically spread across two 1-hour project slots scheduled in my calendar over the next 2 days.
This would save a lot of manual effort and keep project blocks structured.